-
Full Opening Check ValveOct 27, 2026Documents: EN 10204 3.1 or 3.2, dimensional report with the measured bore, PMI, NACE MR0175 on request
MOQ: One piece
Lead time: 10 to 15 -
Pressure Seal Tilting Disc Check ValveOct 27, 2026Certificates: EN 10204 3.1 as standard, 3.2 with a witnessed inspection
Minimum order: One piece
Lead time: 15 to 30 days ex works for WCB a -
Pressure Seal Lift Check ValveOct 27, 2026A pressure seal lift check valve at Class 600, NPS 6 is 559 mm long, which is exactly the length of a gate valve of the same size and class, because A
-
Pressure Seal Swing Check ValveOct 27, 2026MOQ: 1 piece
7 days from stock in common WCB and WC6 sizes, 25 to 40 days for Class 1500 and 2500;
FOB Tianjin;
warranty 18 months from s -
Pressure Seal Y-Pattern Globe ValveOct 27, 2026Minimum order: 1 piece
Lead time: About 7 days for common stock sizes; 20 to 25 days made to order; transit from Tianjin
Packing: End protec -
Pressure Seal Globe ValveOct 27, 2026Certificates: EN 10204 3.1 as standard, 3.2 on request; NACE MR0175 on request
Commercial: MOQ 1 piece; stock sizes 7 days; made to order 20–25 d -
Pressure Seal Gate ValveOct 27, 2026Certificates: EN 10204 3.1 as standard, EN 10204 3.2 on request, with PED documentation for EU delivery
Commercial: MOQ 1 piece · stock sizes abo -
Stainless Steel Check ValveOct 27, 2026A stainless steel check valve is the only valve in the line that nobody can watch. There is no handwheel to turn, no position indicator to read and no
-
Stainless Steel Globe Valve: An OverviewOct 27, 2026Documents:EN 10204 3.1 inspection certificate; 3.2 on request
Minimum order: 1 piece; stock sizes about 7 days, production 20 to 25 days from dra -
Stainless Steel Gate Valve: An OverviewOct 27, 2026Certificate: EN 10204 3.1 with heat number; EN 10204 3.2 on request
MOQ: 1 piece
Lead time: 7 days from stock, 20 to 25 days for production< -
Through Conduit Expanding Gate ValveOct 27, 2026A through conduit expanding gate valve is an API 6D gate valve whose closure is two pieces — a gate and a segment — held together during travel and fo
-
Through Conduit Slab Gate ValveOct 27, 2026A through conduit slab gate valve is an API 6D gate valve whose closure member is a single plate with a bore machined through it, so a full bore pipel












